White Paper | August 18, 2005
White Paper: Six Years Of Short-Bed Demineralization At The Ontario Health Science Centre
Source: Eco-Tec Inc.
The
bid specification for the water treatment
component called for a system that was capable
of producing 120 US gallons per minute of
deionized water with a specific conductivity of
less than 1 µS/cm,and a silica content of less
than 20 ppb...
